Guidance for ttcs

The “Date” column indicates (if shown in brackets) the month that the reference was notified to the Committee; or, if not in brackets, it indicates the date of the hearing

References to the Timetabling Committee were registered with prefix ‘ttc’. Those which were taken forward on 15 April 2005 for hearing by a Timetabling Panel were re-registered with prefix ‘TTP’. Both registration numbers are shown where appropriate. Details of TTP references can be found here.

Reference Number PDF Version Date Reference From Subject Submissions From The Parties
TTC1
TTC1
01.12.94 South Wales & West Railway Application of Rules of the Route (possession times) by Great Western Zone
TTC2
TTC2
15.12.94 Central Trains Application of Rules of the Plan (sectional running times) by Midland Zone
TTC3
TTC3
15.12.94 West Anglia Great Northern Railway Application of Rules of the Route by East Coast Zone
TTC4 (Feb. 95) LTS Rail Application of Rules of the Plan (Barking resignalling Easter 1995) (settled out of court)
TTC5
TTC5
28.06.95 Regional Railways North East Application of Rules of the Plan (Doncaster-Cleethorpes) by LNE Zone
TTC6 (Sep. 95) Loadhaul Responses received to bids (settled out of court)
TTC7 (Sep. 95) Network South Central Flexing of trains (settled out of court)
TTC8 (Sep. 95) Network South Central Rules of the Route (settled out of court)
TTC9
TTC9
10.11.95 Regional Railways North East Application of Rules of the Plan by LNE Zone
TTC10 (Feb. 96) Regional Railways North East Application of Rules of the Route (at Huncoat) by LNE Zone (settled out of court)
TTC11
TTC11
22.03.96 Rail express systems Ltd Railtrack offer in the first iteration of the Winter 1996 timetable
TTC12
TTC12
20.05.96 North London Railways Railtrack offer in the first iteration of the Winter 1996 timetable
TTC13
TTC13
04.06.96 Great Western Trains Railtrack's publication of the level 1 Train Regulation Statement
TTC14
TTC14
18.06.96 West Anglia Great Northern Railtrack's proposals for the Rules of the Route/Plan for the Summer 1997 timetable
TTC15 (May 96) Regional Railways North East Railtrack's proposals for the Rules of the Route/Plan for the Summer 1997 timetable (settled out of court)
TTC16 (June 96) Reference by Central Trains submitted after deadline of 7.6.96. Application declined
TTC17
TTC17
01.07.96 The Committee sought representations from all Industry Parties regarding an aspect of process Introduction by Railtrack of significant changes and new material to Section 6 of the Route Compendium.
TTC18
TTC18
18.10.96 South Wales & West Railway: (1) Railtrack decision in the 1st iteration offer of the Summer 1997 timetable [published as determination No.18] (2) Insufficient information from Railtrack in respect of offers made to other operators in the 1st iteration, Summer 1997 timetable [published as determination No.19]
TTC19
TTC19
(Oct. 96) Anglia Railways Train Services Railtrack decision in the 1st iteration offer of the Summer 1997 timetable (settled out of court)
TTC20 (Oct. 96) North London Railways Method of application of EMU timing loads in 1st iteration of Summer 1997 Timetable (settled out of court)
TTC21
TTC21
22 & 25 .10.96 Thames Trains Railtrack decisions in the 1st iteration offer of the Summer 1997 timetable
TTC22
TTC22
25.10.96 Regional Railways North East Railtrack decisions in the 1st iteration offer of the Summer 1997 timetable
TTC23 (Oct. 96) Central Trains Railtrack decisions in the 1st iteration offer of the Summer 1997 timetable (settled out of court)
TTC24
TTC24
28.10.96 Regional Railways North East Railtrack’s proposals for extraordinary Possessions in January-March 1997
TTC25
TTC25
28.10.96 Regional Railways North East Railtrack’s proposals for Rules of the Route/Plan for the Winter 1997 timetable
TTC26 (Oct. 96) South Wales & West Railway Access Planning Process: Rules of the Plan for the Winter 1997 timetable (settled out of court)
TTC27 (Feb. 97) Anglia Railways Railtrack's decision in 1st iteration of the Winter 1997 timetable (settled out of court)
TTC28 (Feb. 97) EWS (Rail Express Systems) Railtrack's decision on Royal Mail services in 1st iteration of the Winter 1997 timetable (settled out of court)
TTC29 (Feb. 97) North West Regional Railways Railtrack's decision in 1st iteration of the Winter 1997 timetable: Access to Crewe CET siding (settled out of court)
TTC30 (Feb. 97) Railfreight Distribution Railtrack's (lack of) decision in 1st iteration of the Winter 1997 timetable (settled out of court)
TTC31 (Feb. 97) Great Western Trains Railtrack's decision in 1st iteration of the Winter 1997 timetable in regard to some SO services (settled out of court)
TTC32
TTC32
TTC32
04.03.97 South Wales & West Railway and Railtrack Railtrack's decision in 1st iteration of the Winter 1997 timetable (see also AD12)
TTC33 (Mar. 97) English Welsh & Scottish Railway Railtrack's decision to amend unilaterally an offer previously agreed by EWS (on Kings Lynn line) (settled out of court)
TTC34 (May 97) Great Western Trains Railtrack’s proposals for the Summer 1998 Rules of the Route (settled out of court)
TTC35
TTC35
12.06.97 Central Trains Railtrack’s failure to include in its consultation on Rules of the Route a party that was negotiating Access Rights for a relevant Route
TTC36 (May 97) English Welsh & Scottish Railway Railtrack’s proposals for the Summer 1998 Rules of the Route (settled out of court)
TTC37 (May 97) Great Eastern Railway and Railtrack Railtrack’s proposals for the Summer 1998 Rules of the Plan (withdrawn; resubmitted as AD15)
TTC38
TTC38
13.06.97 Regional Railways North East Railtrack’s Summer 1998/99 National Rules of the Plan document
TTC39
TTC39
10.10.97 English Welsh & Scottish Railway Railtrack’s proposals for the Summer 1998 Rules of the Plan (and National Rules of the Plan document)
TTC40
TTC40
10.10.97 Regional Railways North East Railtrack’s decision in 1st iteration of the Summer 1998 timetable
TTC41 (Sep. 97) Regional Railways North East Railtrack’s decision in 1st iteration of the Summer 1998 timetable (settled out of court)
TTC42 (Sep. 97) North London Railways (Silverlink Trains) Railtrack’s decision in 1st iteration of the Summer 1998 timetable (settled out of court)
TTC43 (Sep. 97) Anglia Railways Railtrack’s decision in 1st iteration of the Summer 1998 timetable (settled out of court)
TTC44 (Sep. 97) English Welsh & Scottish Railway Railtrack’s decision in 1st iteration of the Summer 1998 timetable (settled out of court)
TTC45 (Sep. 97) North Western Trains Railtrack’s decision in 1st iteration of the Summer 1998 timetable (settled out of court)
TTC46 15.10.97 Eurostar (U.K.) i) Railtrack’s failure to respond to a Bid (settled out of court) ii) Railtrack’s decision in 1st iteration of the Summer 1998 timetable (timed out; not submitted within prescribed time scales) Note: The Committee, having established that (i) Railtrack had now made a response, and that (ii) above was timed out, decided not to issue a determination, but to issue an Extraordinary Note about certain unsatisfactory features that it had detected.
TTC47 (Oct. 97) Virgin Trains (West Coast) Railtrack’s decision in 1st iteration of the Summer 1998 timetable (settled out of court)
TTC48 (Oct. 97) Regional Railways North East Railtrack’s proposals for the Winter 1998 Rules of the Route/Plan: (settled out of court)
TTC49 (Dec. 97) Eurostar (UK) Railtrack’s decision in 2nd iteration of the Summer 1998 timetable: (settled out of court)
TTC50 (Dec. 97) Thameslink Rail Railtrack’s decision in 2nd iteration of the Summer 1998 timetable: (settled out of court)
TTC51 (Dec. 97) English Welsh & Scottish Railway Railtrack’s decision on retimings of services for engineering work: (settled out of court)
TTC52 (Feb. 98) Great Western Trains Railtrack’s decision in 1st iteration of the Winter 1998 timetable: (settled out of court)
TTC53 (Feb. 98) Anglia Railways Railtrack’s decision in 1st iteration of the Winter 1998 timetable: (settled out of court)
TTC54 (Feb. 98) Thames Trains Railtrack’s decision in 1st iteration of the Winter 1998 timetable: (settled out of court)
TTC55 (Apr. 98) English Welsh & Scottish Railway Railtrack’s decision in response to a Spot Bid (settled out of court)
TTC56 (May 98) Wales & West Railway Railtrack’s decision in 2nd iteration of the Winter 1998 timetable: (settled out of court)
TTC57 (May 98) Central Trains Railtrack’s proposals for the Rules of the Route/Plan for 1999/2000: (settled out of court)
TTC58
TTC58
09.07.98 English Welsh & Scottish Railway Railtrack’s National Rules of the Plan (1999). EWS challenged whether Railtrack had properly complied with Determination 39
TTC59 (May 98) Northern Spirit Railtrack’s proposals for the Rules of the Route/Plan for 1999/2000: (settled out of court)
TTC60 (Oct. 98) Eurostar (U.K.) Railtrack’s decision in 1st iteration of the Summer 1999 timetable: (settled out of court)
TTC61 (Oct. 98) Great Western Trains Railtrack’s decision in 1st iteration of the Summer 1999 timetable: (settled out of court)
TTC62 (Oct. 98) Wales & West Railtrack’s decision in 1st iteration of the Summer 1999 timetable: (settled out of court)
TTC63
TTC63
23.10.98 Anglia Railways Railtrack’s decision in the 1st iteration of the Summer 1999 timetable regarding Boat Trains to/from Harwich
TTC64 (Oct. 98) English Welsh & Scottish Railway Railtrack’s decision in 1st iteration of the Summer 1999 timetable: (settled out of court)
TTC65 (Oct. 98) North Western Trains Railtrack’s proposals for the Rules of the Route/Plan for Winter 1999: (settled out of court)
TTC66 (Oct. 98) English Welsh & Scottish Railway Railtrack’s proposals for the Rules of the Route/Plan for Winter 1999: (settled out of court)
TTC67
TTC67
30.10.98 Northern Spirit Application of Rules of the Plan (Sectional Running Times) by Railtrack N.W.Zone
TTC68 (Oct. 98) Connex South Central Railtrack’s proposals for the Rules of the Route/Plan for Winter 1999: (settled out of court)
TTC69 (Oct. 98) Wales & West Railtrack’s proposals for the Rules of the Route/Plan for Winter 1999: (settled out of court)
TTC70 (Oct. 98) West Anglia Great Northern Railtrack’s proposals for the Rules of the Route/Plan for Winter 1999: (settled out of court)
TTC71 (Dec. 98) Great Western Trains Railtrack’s decision in 2nd iteration of the Summer 1999 timetable: (settled out of court)
TTC72 (Dec. 98) Anglia Railways Railtrack’s decision in 2nd iteration of the Summer 1999 timetable: (settled out of court)
TTC73 (Feb. 99) Northern Spirit Railtrack’s decision in 1st iteration of the Winter 1999 timetable: (settled out of court)
TTC74 (May 99) Eurostar (U.K.) Railtrack’s decision in 2nd iteration of the Winter 1999 timetable: (settled out of court)
TTC75
TTC75
08.06.99 Thameslink Rail Railtrack’s decision in 2nd iteration of the Winter 1999 timetable: Standard hour off-peak paths Gatwick – Brighton
TTC76 (May 99) ScotRail Railways Railtrack’s decision in 2nd iteration of the Winter 1999 timetable: (settled out of court)
TTC77 (May 99) Great Western Trains Railtrack’s decision in 2nd iteration of the Winter 1999 timetable: (settled out of court)
TTC78 (May 99) English Welsh & Scottish Railway Railtrack’s decision in 2nd iteration of the Winter 1999 timetable: (settled out of court)
TTC79 (Aug. 99) Northern Spirit Railtrack’s proposals for the Rules of the Route/Plan for 2000/01: As the matters were solely concerned with the Rules for the Winter period 2000/01, the Committee exhorted the parties to continue discussions; if not resolved, Northern Spirit could bring a reference following publication of the Winter Rules Revisions. (deferred; subsequently resubmitted as ttc86)
TTC80
TTC80
16.09.99 English Welsh & Scottish Railway Railtrack’s proposals for the Rules of the Route/Plan for the Summer 2000 timetable: The Committee did not make a determination but issued an Extraordinary Note about certain unsatisfactory features that it had detected. The Parties were instructed to resume discussions on the basis of a common understanding of information relating to Rules of the Route, Railtrack’s proposed timings and the working arrangements at the affected locations. In the event of the Parties failing to resolve the dispute they were advised to make a further jointly agreed submission, with a request that the Dispute Hearing be reconvened.
TTC81 (Aug. 99) Great Western Trains Railtrack’s decision on Draft Timetable for Summer 2000: (settled out of court)
TTC82
TTC82
15.09.99 Great Western Trains Railtrack’s decision on Draft Timetable for Summer 2000: Paddington - Worcester services
TTC83 (Sep. 99) Thames Trains Railtrack’s decision on Draft Timetable for Summer 2000: (settled out of court)
TTC84 (Nov. 99) Eurostar (U.K.) Railtrack’s proposals for the Rules of the Route/Plan for Winter 2000/01: (settled out of court)
TTC85
TTC85
21.12.99 Great Western Trains Railtrack’s proposals for the Rules of the Route/Plan for Winter 2000/01: Pathing and headways
TTC86 (Dec. 99) Northern Spirit Railtrack’s proposals for the Rules of the Route/Plan for Winter 2000/01: (settled out of court)
TTC87
TTC87
20.12.99 & 27.01.00 English Welsh & Scottish Railway Railtrack’s decision for the Rules of the Route/Plan for Winter 2000/01 - Engineering allowances: Camden - Rugby
TTC88
TTC88
05.01.00 Rail Express Systems Railtrack’s decision in respect of Bids for the Summer 2000 timetable: Weekly service Waterloo – Salisbury
TTC89
TTC89
12.01.00 Thames Trains Railtrack’s decision in respect of Bids for the Summer 2000 timetable: Paddington - Oxford service
TTC90 (Dec. 99) Great North Eastern Railway Railtrack’s decision in respect of Bids for the Summer 2000 timetable: (settled out of court)
TTC91
TTC91
12.01.00 Great Western Trains Railtrack’s decision in respect of Bids for the Summer 2000 timetable: Paddington - Oxford - Worcester service
TTC92 (Dec. 99) Freightliner Railtrack’s decision in respect of Bids for the Summer 2000 timetable: (settled out of court)
TTC93
TTC93
11.01.00 Great North Eastern Railway Railtrack’s decision in respect of Bids for the Summer 2000 timetable: Flexing of services to Glasgow
TTC94 (Dec. 99) English Welsh & Scottish Railway Railtrack’s decision in respect of Bids for the Summer 2000 timetable: (settled out of court)
TTC95
TTC95
17.01.00 Northern Spirit Railtrack’s decision in respect of Bids for the Summer 2000 timetable: Application of Performance allowances
TTC96 (Apr. 00) Thames Trains Railtrack’s decision in respect of Bids for the Winter 2000/01 timetable: (settled out of court)
TTC97 (Apr. 00) Wales & West Passenger Trains Railtrack’s decision in respect of Bids for the Winter 2000/01 timetable: (settled out of court)
TTC98 (July 00) Anglia Railways Train Regulation Statements: Alleged that Railtrack was not complying with the provisions of Condition H11: (settled out of court)
TTC99 (July 00) Connex South Eastern Railtrack’s proposals for the Rules of the Route 2001/02: (settled out of court)
TTC100 (July 00) The Chiltern Railway Company Railtrack’s proposals for the Rules of the Route 2001/02: (settled out of court)
TTC101 (July 00) West Anglia Great Northern Railtrack’s proposals for the Rules of the Route/Plan 2001/02: (withdrawn by referrer)
TTC102 (July 00) Silverlink Railtrack’s proposals for the Rules of the Route 2001/02: (settled out of court)
TTC103 (July 00) Great Western Trains Railtrack’s proposals for the Rules of the Route 2001/02: (settled out of court)
TTC104 (July 00) Wales & West Passenger Trains Railtrack’s proposals for the Rules of the Route 2001/02: (settled out of court)
TTC105
TTC105
07.12.00 Freightliner Railtrack’s proposals for the Rules of the Route 2001/02
TTC106
TTC106
07.12.00 English Welsh & Scottish Railway Railtrack’s proposals for the Rules of the Route 2001/02:
TTC107 (Aug. 00) Eurostar (U.K.) Railtrack’s proposals for the Rules of the Route 2001/02: (settled out of court)
TTC108 (Aug. 00) Thames Trains Railtrack’s decision to reject services for the Summer 2001 timetable: (withdrawn by the referrer)
TTC109
TTC109
01.11.00 North Western Trains Railtrack’s decision in respect of the Rules of the Plan 2001/02
TTC110 01.11.00 Northern Spirit Railtrack’s decision in respect of the Rules of the Plan 2001/02
TTC111 (Oct. 00) Thames Trains Railtrack’s decision in respect of Bids for the Summer 2001 timetable: (settled out of court)
TTC112 (Dec. 00) Great Western Trains Railtrack’s decision in respect of Bids for the Summer 2001 timetable: (settled out of court)
TTC113 (Dec. 00) Freightliner Railtrack’s decision in respect of Bids for the Summer 2001 timetable: (settled out of court)
TTC114 (Dec. 00) English Welsh & Scottish Railway Railtrack’s decision in respect of Bids for the Summer 2001 timetable: (settled out of court)
TTC115 (Mar. 01) Great Western Trains Railtrack’s decision in respect of Bids for the Winter 2001/02 timetable: (settled out of court)
TTC116 (Mar. 01) Thameslink Rail Railtrack’s decision in respect of a Spot Bid: (settled out of court)
TTC117 (Mar. 01) Great Western Trains Railtrack’s decision in respect of Bids for the Winter 2001/02 timetable: (settled out of court)
TTC118 (May 01) North Western Trains Railtrack’s decision in respect of the National Rules of the Plan (section3, clause 5.3) for the 2002 timetable: (settled out of court)
TTC119 (May 01) Arriva Trains Northern Railtrack’s decision on proposed amendments to the Rules of the Route 2001/02: (settled out of court)
TTC120 (June 01) English Welsh & Scottish Railway Railtrack’s decision in respect of Bids for the Winter 2001/02 timetable: (settled out of court)
TTC121 (July 01) Great Western Trains Railtrack’s decision in respect of a proposal for possessions at Reading on 28/29.7.01: (settled out of court)
TTC122 (July 01) Connex South Central Railtrack’s decision to withdraw section 3 guidelines for granting possessions; Southern Zone Rules of the Route 2002/03: (settled out of court)
TTC123 (July 01) Connex South Eastern Railtrack’s decision to withdraw section 3 guidelines for granting possessions; Southern Zone Rules of the Route 2002/03: (settled out of court)
TTC124 (Aug. 01) Thames Trains Railtrack’s decision in respect of version 2 of the Rules of the Route for 2002/03: (settled out of court)
TTC125 (Aug. 01) Great Western Trains Railtrack’s decision in respect of version 2 of the Rules of the Route for 2002/03: (settled out of court)
TTC126 (Aug. 01) Central Trains Railtrack’s decision in respect of version 2 of the Rules of the Route for 2002/03: (settled out of court)
TTC127 (Aug. 01) North Western Trains Railtrack’s decision in respect of version 2 of the Rules of the Route for 2002/03: (settled out of court)
TTC128 (Aug. 01) Great North Eastern Railway Railtrack’s decision in respect of version 2 of the Rules of the Route for 2002/03: (settled out of court)
TTC129
TTC129
08.02.02 English Welsh & Scottish Railway Railtrack’s decision in respect of the Rules of the Route/Plan for 2002/03 [Anglo-Scottish Maintenance Strategy on the West Coast Main Line]: (settled out of court)
TTC130 (Aug. 01) Freightliner Railtrack’s decision in respect of version 2 of the Rules of the Route for 2002/03: (settled out of court)
TTC131 (Aug. 01) Arriva Trains Northern Railtrack’s decision in respect of version 2 of the Rules of the Route for 2002/03: (settled out of court)
TTC132
TTC132
TTC132
30.11.01 Eurostar (U.K.) Railtrack’s decision to suspend Train Slots for Eurostar night services in the Draft Timetable for Summer 2002:
TTC133 (Oct. 01) Rail Express Systems Railtrack’s decision in respect of a Spot Bid for 1S06 Royal Mail train: (settled out of court)
TTC134 (Oct. 01) Thames Trains A Railtrack ‘decision’ in respect of the Draft Timetable for Summer 2002: (settled out of court)
TTC135 (Nov. 01) South Central A Railtrack ‘decision’ in respect of the Draft Timetable for Summer 2002: (settled out of court)
TTC136
TTC136
14.03.02 Arriva Trains Northern Railtrack’s decision in respect of the Rules of the Route/Plan for Winter 2002/03
TTC137 (Dec. 01) Connex South Eastern Railtrack’s decision in respect of Bids for the Summer 2002 timetable: (settled out of court)
TTC138 (Dec. 01) Thameslink Rail Railtrack’s decision in respect of Bids for the Summer 2002 timetable: (settled out of court)
TTC139 (Dec. 01) ScotRail Railways Railtrack’s decision in respect of Bids for the Summer 2002 timetable: (settled out of court)
TTC140 (Dec. 01) Great Western Trains Railtrack’s decision in respect of Bids for the Summer 2002 timetable: (settled out of court)
TTC141 (Dec. 01) Wessex Trains Railtrack’s decision in respect of the use of Platform 0 at Cardiff Central for the Summer 2002 timetable: (settled out of court)
TTC142 (Dec. 01) Freightliner Railtrack’s decision in respect of Bids for the Summer 2002 timetable: (settled out of court)
TTC143 (Mar.02) Great Western Trains Railtrack’s decision in respect of changes to the Rules of the Route for September 2002: (settled out of court)
TTC144
TTC144
24.05.02 Grand Central Railway Railtrack’s decision in respect of Bids for the Winter 2002 timetable:
TTC145 (Apr.02) Arriva Trains Northern Railtrack’s decision in respect of the Rules of the Route/Plan for the Winter Two timetable 2002/03: (settled out of court)
TTC146 (Apr.02) Central Trains Railtrack’s decision in respect of Bids for the Winter One timetable 2002/03: (settled out of court)
TTC147 (Apr.02) Great North Eastern Railway Railtrack’s decision in respect of Bids for the Winter 2002/03 timetable: (settled out of court)
TTC148 (Apr.02) Wessex Trains Railtrack’s decision in respect of Bids for the Winter 2002/03 timetable: (withdrawn by referrer)
TTC149 (Apr. 02) English Welsh & Scottish Railway Railtrack’s decision in respect of Bids for the Winter 2002/03 timetable: (settled out of court)
TTC150 (May 02) Great Western Trains Railtrack’s decision in respect of Bids for the Winter 2002 timetable: (settled out of court)
TTC151 (July 02) Great North Eastern Railway Railtrack’s decision in respect of the Rules of the Plan for 2003/04: (settled out of court)
TTC152 (July 02) Great Western Trains Railtrack’s decision in respect of the Rules of the Route/Plan for 2003/04: (settled out of court)
TTC153 (July 02) ScotRail Railways Railtrack’s decision in respect of the Rules of the Route/Plan for 2003/04: (settled out of court)
TTC154 (July 02) West Coast Trains Railtrack’s decision in respect of the Rules of the Route for 2003/04: (settled out of court)
TTC155
TTC155
22.10.02 Thames Trains Railtrack’s decision in respect of the Rules of the Route/Plan for 2003/04:
TTC156 (July 02) North Western Trains Railtrack’s decision in respect of the Rules of the Route/Plan for 2003/04: (settled out of court)
TTC157 (July 02) Silverlink Train Services Railtrack’s decision in respect of the Rules of the Route for 2003/04: (settled out of court)
TTC158 (July 02) Central Trains Railtrack’s decision in respect of the Rules of the Route/Plan for 2003/04: (settled out of court)
TTC159 (July 02) Great North Eastern Railway Railtrack’s decision in respect of the Rules of the Route for 2003/04: (settled out of court)
TTC160 (July 02) West Anglia Great Northern Railtrack’s decision in respect of the Rules of the Route/Plan for 2003/04: (settled out of court)
TTC161 20.09.02 Arriva Trains Northern Railtrack’s decision in respect of the Rules of the Route/Plan for 2003/04:
TTC161A
TTC161A
20.09.02 Arriva Trains Northern Two determinations were issued: Determination 161A - granted the parties additional time to reach agreement on matters relating to Sections 5 & 7 of the Rules of the Route, and gave specific deadlines by which the parties should refer unresolved issues back to the Committee for determination;
TTC161B
TTC161B
20.09.02 Arriva Trains Northern Determination 161B - contained decisions relating to the National Rules of the Plan
TTC161C
TTC161C
25.10.02 Arriva Trains Northern Unresolved issues relating to Section 5 of the Rules of the Route for 2003/04, referred back in accordance with Determination 161A: (settled out of court)
TTC162 (July 02) English Welsh & Scottish Railway Railtrack’s decision in respect of the Rules of the Route/Plan (Version 2) 2003/04: (settled out of court)
TTC163 [not used]
TTC164 (Aug.02) English Welsh & Scottish Railway Railtrack’s decision in respect of Bids for the Winter Two 2002/03 timetable: (settled out of court)
TTC165 (Sept.02) English Welsh & Scottish Railway National Rules of the Plan, Section 3: possession strategy for Dolphingstone: (settled out of court)
TTC166 (Oct.02) Freightliner Railtrack’s decision in respect of the Rules of the Route/Plan (Version 3) 2003/04: (settled out of court)
TTC167 (Dec.02) CrossCountry Trains Railtrack’s decision in respect of the Rules of the Route (Version 4) 2003/04: (settled out of court)
TTC168
TTC168
23.01.03 Grand Central Railway Railtrack’s decision in respect of Bids for the Summer 2003 timetable:
TTC169 (Dec.02) Great North Eastern Railway Railtrack’s decision in respect of the Rules of the Route/Plan (Version 4) 2003/04: (settled out of court)
TTC170 (Dec.02) Arriva Trains Northern Railtrack’s decision in respect of the Rules of the Route/Plan (Version 4) 2003/04: (withdrawn by referrer)
TTC171 (Dec.02) Thames Trains Railtrack’s decision in respect of the Rules of the Route (Version 4) 2003/04: (withdrawn by referrer)
TTC172 (Dec.02) Freightliner Railtrack’s decision in respect of Bids for the Summer 2003 timetable: (withdrawn by referrer)
TTC173 (Dec.02) Great Western Trains Railtrack’s decision in respect of Bids for the Summer 2003 timetable: (withdrawn by referrer)
TTC174 (Dec.02) English Welsh & Scottish Railway Railtrack’s decision in respect of Bids for the Summer 2003 timetable: (settled out of court)
TTC175 (Apr.03) English Welsh & Scottish Railway Network Rail’s decision in respect of Rules of the Route (Paddington re-signalling): (settled out of court)
TTC176 (Apr.03) English Welsh & Scottish Railway Network Rail’s decision in respect of Bids for the Winter One 2003/04 timetable for Anglo-Scottish services: (settled out of court)
TTC177 (Apr.03) English Welsh & Scottish Railway Network Rail’s decision in respect of Bids for the Winter One 2003/04 timetable for other than Anglo-Scottish services: (settled out of court)
TTC178 (Apr.03) Freightliner Network Rail’s decision in respect of Bids for the Winter One 2003/04 timetable: (settled out of court)
TTC179 (Apr.03) Great Western Trains Network Rail’s decision in respect of Bids for the Winter One 2003/04 timetable: (settled out of court)
TTC180
TTC180
04.08.03 ScotRail Railways Network Rail’s decision in respect of the Rules of the Route for the Winter Two period of the 2003/04 Timetable: The Committee issued a Note of Extraordinary deliberations to explain why, for technical reasons, it could not issue a formal determination.
TTC181 (July 03) Grand Central Railway Railtrack’s decision in respect of Bids for the Winter Two 2003/4 timetable: (settled out of court)
TTC182
TTC182
29.08.03 Great Western Trains Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2004:
TTC183 (July 03) The Chiltern Railway Co. Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2004: (settled out of court)
TTC184 (July 03) North Western Trains Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2004: (settled out of court)
TTC185 (July 03) Freightliner Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2004: (settled out of court)
TTC186 (Aug.03) English Welsh & Scottish Railway Railtrack’s decision in respect of Bids for the Winter Two 2003/04 timetable: (settled out of court)
TTC187 (Aug.03) English Welsh & Scottish Railway Network Rail’s decision in respect of the Rules of the Route/Plan for 2004: (settled out of court)
TTC188 (Aug.03) Arriva Trains Northern Network Rail’s decision in respect of the Rules of the Route/Plan for 2004: (settled out of court)
TTC189
TTC189
9/28.10.03 Thames Trains Network Rail’s decision in respect of the Rules of the Route for 2004:
TTC190
TTC190
10.10.03 Silverlink Train Services Network Rail’s decision in respect of the Rules of the Route for 2004:
TTC191
TTC191
23.12.03 Freightliner Heavy Haul Network Rail’s decision in respect of Bids for the Winter Two 2003/04 timetable:
TTC192
TTC192
23.09.03 Great North Eastern Railway Network Rail’s decision in respect of the Rules of the Route/Plan for 2004:
TTC193 (Aug.03) English Welsh & Scottish Railway Network Rail’s decision in disregard of Condition D3.7.5: [Note: after discussion train retimed to satisfaction of all parties]: (settled out of court)
TTC194
TTC194
26.09.03 ScotRail Railways Network Rail’s decision in respect of Bids for the Winter Two 2003/04 timetable:
TTC195 (Sep.03) Freightliner Network Rail’s decision in respect of the Rules of the Route/Plan (Version 3) for 2004: (settled out of court)
TTC196 (Sep.03) Great North Eastern Railway Network Rail’s decision in respect of the Rules of the Route/Plan (Version 3) for 2004: (settled out of court)
TTC197 (Sep.03) English Welsh & Scottish Railway Network Rail’s decision in respect of the Rules of the Route/Plan (Version 3) for 2004: (settled out of court)
TTC198 (Dec.03) CrossCountry Trains Network Rail’s decision in respect of an amendment to the Rules of the Route for weeks 17-22 at Stafford: (settled out of court)
TTC199 (Dec.03) Silverlink Train Services (London lines) Network Rail’s decision in respect of an amendment to the Rules of the Route for the late Spring Bank Holiday 2004: (settled out of court)
TTC200 (Dec.03) Freightliner Network Rail’s decision in respect of Bids for the Summer 2004 timetable (settled out of court)
TTC201 (Dec.03) English Welsh & Scottish Railway Network Rail’s decision in respect of Bids for the Summer 2004 timetable (settled out of court)
TTC202 (Dec.03) Freightliner Heavy Haul Network Rail’s decision in respect of Bids for the Summer 2004 timetable (settled out of court)
TTC203
TTC203
29.01.04 Thames Trains Network Rail’s decision in respect of Bids for the Summer 2004 timetable
TTC204 (Jan.04) CrossCountry Trains Network Rail’s decision in respect of an amendment to Rules of the Route for 2004: Periods 4b & 5 (Crewe-Cheadle Hulme) (settled out of court)
TTC205
TTC205
04.03.04 English Welsh & Scottish Railway Adherence to acceptance procedures in respect of a Spot Bid for 7O81:
TTC206 (Jan.04) ScotRail Railways Network Rail’s decision in respect of the Rules of the Route (Version 4) for 2004: (settled out of court)
TTC207 (Jan.04) ScotRail Railways Network Rail’s decision in respect of an amendment to the Rules of the Route for 2003/04 (weeks 50 & 51): (settled out of court)
TTC208 (Jan.04) Freightliner Network Rail’s decision in respect of the Rules of the Route (Version 4) for 2004: (settled out of court)
TTC209 (Jan.04) Great Western Trains Network Rail’s decision in respect of the Rules of the Route (Version 4) for 2004: (settled out of court)
TTC210 (Jan.04) Arriva Trains Northern Network Rail’s decision in respect of the Rules of the Route/Plan (Version 4) for 2004: (settled out of court)
TTC211
TTC211
23.03.04 Freightliner Network Rail’s decision in respect of short notice additional possessions on the WCML: weeks 1-8, 2004
TTC212
TTC212
23.03.04 English Welsh & Scottish Railway Network Rail’s decision in respect of short notice additional possessions on the WCML: weeks 1-8, 2004
TTC213
TTC213
23.03.04 ScotRail Railways Network Rail’s decision in respect of short notice additional possessions on the WCML: weeks 1-8, 2004
TTC214 (Mar.04) Silverlink Train Services Network Rail’s decision in respect of short notice additional possessions on the WCML: weeks 2 & 4, 2004 (withdrawn by referrer)
TTC215 (Mar.04) North Western Trains Extended Disruption (Condition H7): Damaged Network at Bootle Branch Jcn (settled out of court)
TTC216 (Feb.04) Silverlink Train Service Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2005 (lapsed when Silverlink submitted reference NV65 to the Network and Vehicle Change Committee)
TTC217 (Feb.04) Arriva Trains Wales Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2005 (settled out of court)
TTC218 (Feb.04) ScotRail Railways Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2005 (settled out of court)
TTC219 (Feb.04) Freightliner Heavy Haul Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2005 (settled out of court)
TTC220 (Feb.04) Arriva Trains Northern Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2005 (settled out of court)
TTC221 (Feb.04) Great Northern Eastern Railway Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2005 (settled out of court)
TTC222 (Feb.04) Central Trains Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2005 (settled out of court)
TTC223 (Feb.04) North Western Trains Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2005 (settled out of court)
TTC224 (Feb.04) CrossCountry Trains Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2005 (settled out of court)
TTC225 (Apr.04) English Welsh & Scottish Railway Network Rail’s decision in respect of the Rules of the Route for WCML, August 2005 (settled out of court)
TTC226 (May 04) ScotRail Railways Network Rail’s decision in respect of the Rules of the Route (Versions 3 & 4) for 2005 (settled out of court)
TTC227 (June 04) Freightliner Network Rail’s decision in respect of the Rules of the Route (Version 3) for 2005 (settled out of court)
TTC228 (June 04) CrossCountry Trains Network Rail’s decision in respect of the Rules of the Route (Version 3) for 2005 (settled out of court)
TTC229 (June 04) Arriva Trains Northern Network Rail’s amendment in accordance with Condition D2.1.9 in respect of section 7 of the Rules of the Route for 2005 (settled out of court)
TTC230 (Feb.04) English Welsh & Scottish Railway Network Rail’s decision in respect of the Rules of the Route (Version 3) for 2005 (settled out of court)
TTC231 (July 04) English Welsh & Scottish Railway Network Rail’s amendment in accordance with Condition D2.1.9 in respect of the Rules of the Route for 2005 (settled out of court)
TTC232
TTC232
01.09.04 CrossCountry Trains Network Rail’s decision in respect of the Rules of the Route (Version 3) for 2005
TTC233 (Aug.04) West Coast Trains Network Rail’s amendment in accordance with Condition D2.1.9 in respect of the Rules of the Route for 2005 (settled out of court)
TTC234 (Aug.04) English Welsh & Scottish Railway Network Rail’s decision in respect of the Rules of the Route for 2005 – additional possessions in weeks 31 & 32 (settled out of court)
TTC235 (Aug.04) Freightliner Network Rail’s decision in respect of the Rules of the Route (Version 4) for 2005 (settled out of court)
TTC236 (Aug.04) CrossCountry Trains Network Rail’s decision in respect of the Rules of the Route (Version 3) for 2005, Periods 0, A & B (settled out of court)
TTC237 (Aug.04) Arriva Trains Northern Network Rail’s amendment in accordance with Condition D2.1.9 in respect of the Rules of the Route for 2005 (settled out of court)
TTC238 (Aug.04) North Western Trains Network Rail’s decision in respect of the Rules of the Route (Version 4) for 2005, Periods C & D (settled out of court)
TTC239 (Aug.04) CrossCountry Trains Network Rail’s decision (on 10 August 2004) in respect of the Rules of the Route for 2005 (settled out of court)
TTC240 (Aug.04) Freightliner Heavy Haul Network Rail’s decision in respect of Bids for the December 2004 timetable (settled out of court)
TTC241 (Aug.04) ScotRail Railways Network Rail’s decision in respect of Bids for the December 2004 timetable (settled out of court)
TTC242
TTC242
12.10.04 Great Western Trains Network Rail’s decision in respect of Bids for the December 2004 timetable
TTC243 (Aug.04) GB Railfreight Network Rail’s decision in respect of Bids for the December 2004 timetable (settled out of court)
TTC244 12.10.04 First Great Western Link Network Rail’s decision in respect of Bids for the December 2004 timetable
TTC245 (Aug.04) Freightliner Network Rail’s decision in respect of Bids for the December 2004 timetable (settled out of court)
TTC246 (Aug.04) Wessex Trains Network Rail’s decision in respect of Bids for the December 2004 timetable (settled out of court)
TTC247 (Aug.04) South Eastern Trains Network Rail’s decision in respect of Bids for the December 2004 timetable (settled out of court)
TTC248 (Aug.04) Arriva Trains Northern Network Rail’s decision in respect of Bids for the December 2004 timetable (settled out of court)
TTC249 (Aug.04) Eurostar (U.K.) Network Rail’s decision in respect of Bids for the December 2004 timetable (settled out of court)
TTC250 (Aug.04) English Welsh & Scottish Railway Network Rail’s decision in respect of Bids for the December 2004 timetable (settled out of court)
TTC251
TTC251
06.01.05 Great Western Trains Network Rail’s decision in respect of further changes in weeks 1 & 2 to the Rules of the Route for 2005
TTC252
TTC252
25.02.05 Arriva Trains Northern Network Rail’s decision in respect of further changes to the Rules of the Route for 2005 for the Settle & Carlisle line
TTC253 25.02.05 Arriva Trains Northern Network Rail’s decision in respect of further changes to the Rules of the Route for 2005 for the Saltburn branch. The Committee commenced a hearing of this reference from Arriva Trains Northern, but it was soon apparent that much of the information that was emerging during the course of the hearing had not been fully shared between the Parties concerned at the appropriate point in time during the consultation period or subsequently. The Committee therefore instructed the Parties to enter into full and proper dialogue on all relevant issues and, after they had reached a common understanding of the facts, to advise the Committee which elements of the dispute were still unresolved, meanwhile the Committee adjourned the hearing. The Parties subsequently met and after fully sharing the information available reached a solution of their dispute, and Northern Rail formally asked that the dispute be withdrawn. This was agreed by the Committee.
TTC254 (Dec.04) CrossCountry Trains Network Rail’s decision in respect of further changes to the Rules of the Route for 2005 (settled out of court)
TTC255 (Dec.04) LTS Rail Network Rail’s decision in respect of further changes to the Rules of the Route for 2006 (settled out of court)
TTC256
TTC256
02.03.05 Silverlink Train Services Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2006
TTC257 [TTP01] (Dec.04) Northern Rail (East) Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2006 (settled out of court)
TTC258 (Dec.04) New Southern Railway Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2006 (settled out of court)
TTC259 [TTP02] (Dec.04) First ScotRail Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2006 (settled out of court)
TTC260 (Dec.04) West Anglia Great Northern Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2006 (settled out of court)
TTC261 (Dec.04) Heathrow Connect Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2006 (settled out of court)
TTC262 [TTP03] [20.07.05] English Welsh & Scottish Railway PENDING at 15.04.05; and subsequently heard by a Timetabling Panel on 20.07.05 Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2006
TTC263 (Dec.04) Freightliner Network Rail’s decision in respect of the Rules of the Route (Version 2)[for Shenfield – Norwich route] for 2006 (settled out of court)
TTC264 [TTP04] [22.08.05] Freightliner PENDING at 15.04.05; and subsequently heard by a Timetabling Panel on 22.08.05 Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2006
TTC265
TTC265
23.02.05 Arriva Trains Wales Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2006
TTC266 [TTP05] (Dec.04) Great North Eastern Railway Network Rail’s decision in respect of items in Section 7 of the Rules of the Route (Version 2) for 2006 (settled out of court)
TTC267 (Dec.04) Northern Rail (West) Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2006 (settled out of court)
TTC268 (Dec.04) First/Keolis Transpennine Express Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2006 (settled out of court)
TTC269 (Dec.04) South Eastern Trains Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2006 (settled out of court)
TTC270 (Jan.05) CrossCountry Trains Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2006 (settled out of court)
TTC271
TTC271
17.02.05 West Coast Trains Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2006
TTC272 [TTP06] (Jan.05) Great North Eastern Railway Network Rail’s decision in respect of items in Sections 4 & 5 of the Rules of the Route (Version 2) for 2006 (settled out of court)
TTC273 [TTP07] (Dec.04) Freightliner Heavy Haul Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2006 (settled out of court)
TTC274 (Jan.05) Eurostar (U.K.) Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2006 (settled out of court)
TTC275
TTC275
11.03.05 & 29.03.05 Great Western Trains Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2006
TTC276 (Jan.05) First ScotRail Network Rail’s decision in respect of Bids for the June 2005 timetable (settled out of court)
TTC277 (Jan.05) Great Westerrn Trains Network Rail’s decision in respect of Bids for the June 2005 timetable (settled out of court)
TTC278 (Jan.05) Eurostar (U.K.) Network Rail’s decision in respect of Bids for the June 2005 timetable (settled out of court)
TTC279 (Feb.05) English Welsh & Scottish Railway Network Rail’s decision in respect of the changes other than twice yearly to the Rules of the Route for 2006 (settled out of court)
TTC280 (Feb.05) Northern Rail (East) Network Rail’s decision in respect of the changes other than twice yearly to the Rules of the Route for 2006 (settled out of court)
TTC281 [TTP08] (Jan.05) CrossCountry Trains Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2006 (settled out of court)
TTC282 (Feb.05) Freightliner Heavy Haul Network Rail’s decision in respect of changes (in a batching document) to the Rules of the Route for 2006 (settled out of court)
TTC283 (Feb.05) GB Railfreight Network Rail’s decision in respect of changes (in a batching document) to the Rules of the Route for 2006 (settled out of court)
TTC284 (Feb.05) CrossCountry Trains Network Rail’s decision in respect of revised proposals for changes in weeks 11/12 of the Rules of the Route 2005 (settled out of court
TTC285 [TTP09] (Jan.05) First ScotRail Network Rail’s decision in respect of changes (in a batching document) to the Rules of the Route for 2006 (settled out of court)
TTC286 (Feb.05) English Welsh & Scottish Railway Network Rail’s decision in respect of the Rules of the Route (Version 3) for 2005 (settled out of court)
TTC287 [TTP07] (Mar.05) Freightliner Heavy Haul Network Rail’s decision in respect of the Rules of the Route (Version 3) for 2005 (settled out of court)
TTC288 (Mar.05) Northern Rail (East) Network Rail’s decision in respect of the Rules of the Route (batching document 3) for 2006 (settled out of court)
TTC289 (Mar.05) English Welsh & Scottish Railway Network Rail’s decision in respect of the Rules of the Route (batching document 2) for 2006 (settled out of court)
TTC290 [TTP03] [20.07.05] English Welsh & Scottish Railway PENDING at 15.04.05; and subsequently heard by a Timetabling Panel on 20.07.05 Network Rail’s decision in respect of the Rules of the Route (batching document 3) for 2006