Please note that, to comply with GDPR requirements, any submissions that include personal information (i.e. including data in the format firstname.surname@companyname) have been removed from the website. A redacted version can be sought by application to the ADC Secretary. A link to the Committee’s privacy statement can be found here.
Reference Number | PDF Version | Date | Reference From | Subject | Submissions From The Parties |
---|---|---|---|---|---|
ADA1 | (Aug 10) | First ScotRail | Claim that Network Rail is liable for damage to rolling stock (settled out of court) | ||
ADA2 | (Oct 10) | Network Rail | Part J; Change to Access Rights held by DB Schenker Rail (UK) to Uskmouth Power Station (settled out of court) | ||
ADA3 | (Dec 10) | West Coast Trains | Complaint regarding Station Change at Glasgow Central station (settled out of court) | ||
ADA4 | 14.04.11 | DB Schenker Rail (UK) | Attribution of certain types of delay under Schedule 8 of the Track Access Agreement | ||
ADA5 | 10.03.11 | Network Rail | Part J; Change to Access Rights, 12 18 SX from Trafford Park (GBRf and DB Schenker appealed to ORR regarding the determination) | ||
ADA6 | 11.04.11 | First Greater Western | Compensation arrangements in Track Access Agreement, Schedule 4 | ||
ADA7 | 08.08.11 | Southern Railway | Interpretation of Network Change definition in relation to power supply upgrade at East Grinstead | ||
ADA8 | (Apr 11) | Network Rail | Part J; Transfer of Access Rights held by Freightliner Heavy Haul, Tunstead to Drax (settled out of court) | ||
ADA9 | (May 11) | First Capital Connect | Claim that Network Rail is liable for damage to rolling stock (settled out of court) | ||
ADA10 | (July 11) | Freightliner and Freightliner Heavy Haul | Network Change: Removal of Hurlford Crossover and Barleith Siding (settled out of court) | ||
ADA11 | (July 11) | East Coast | Station services issues at certain stations where Northern Rail is SFO (settled out of court) | ||
ADA12 | (Aug 11) | Network Rail | Network Change: Wessex HLOS Train Lengthening Phase 1 – Windsor Line; objection by Freightliner and Freightliner Heavy Haul (settled out of court) | ||
ADA13 | (Oct 11) | Network Rail | Part J; Failure to Use, 02 50 MSX;Y Dollands Moor to Trafford Park (settled out of court) | ||
ADA14 | (Nov 11) | London & Birmingham Railway | Delay Attribution for 5 incidents of foreign objects wrapped around pantographs during 2010 (settled out of court) | ||
ADA15 | (Apr 12) | First Greater Western | Entitlement to refund of part of 2009/10 station Qualifying Expenditure charges paid to Arriva Trains Wales when having previously elected to pay on a Fixed Charges basis (settled out of court) | ||
ADA16 | 27.09.13 | Network Rail | Network Change: Slough West area | ||
ADA17 | 17.10.13 | Network Rail | Network Change: Midland Mainline Permissible Speeds | ||
ADA18 | (Mar 14) | DB Schenker Rail (UK) | Part J: Network Rail’s decision in connection with the Freight transfer mechanism - Rights held by Direct Rail Services (settled out of court) | ||
ADA19 | (Mar 14) | Direct Rail Services | Part J: Network Rail’s decision in connection with the Freight transfer mechanism - Rights to be removed from Direct Rail Services (settled out of court) | ||
ADA20 | (Aug 14) | West Coast Railway Co | Operation of steam trains on Network Rail’s London North Eastern Route (This Adjudication was conducted on the basis of written representations only) | ||
ADA21 | 18.03.15 | GB Railfreight | Part J: Network Rail’s decision in connection with the Freight transfer mechanism - Rights held by Freightliner Heavy Haul (GBRf appealed to ORR regarding the ADA determination but it was upheld by ORR) | ||
ADA22 | (Dec 14) | Freightliner Heavy Haul | Part J: Network Rail’s decision in connection with the Freight transfer mechanism - Rights to be removed from Freightliner Heavy Haul (settled out of court) | ||
ADA23 | (Feb 15) | Stagecoach South Western Trains | Southern Railway declining to accept the basis for certain Fixed Charges in respect of Clapham Junction Station for Accounting Year 2014/15 (settled out of court) | ||
ADA24 | 18.11.15 | XC Trains | Network Change: introduction of “Gotcha” wheel impact load monitoring equipment in certain areas | ||
ADA25 | (June 15) | Network Rail | Network Change: Greenhill Loop (settled out of court) | ||
ADA26 | (Oct 15) | Network Rail | Network Change - West Ealing (settled out of court) | ||
ADA27 | 20.01.16 | West Coast Trains | Breach by Network Rail of “good faith” obligation in Track Access Contract | ||
ADA28 | (Nov 15) | Freightliner Heavy Haul | Part J; Surrender of Access Rights (settled out of court) | ||
ADA29 | 17.02.16 | Govia Thameslink Railway | Network Rail’s continuing liability following transfer of franchise for costs, direct losses and expenses incurred in connection with Network Change to provide new stabling capacity at Cricklewood | ||
ADA30 | 13.07.16 | GB Railfreight | Failure of Network Rail to carry out the determination of ADA17 (Network Rail appealed against paragraphs 7.2 and 7.4 of the determination. The appeal went to arbitration - see A33) | ||
ADA31 | 13.01.17 | Grand Central Railway | Compensation for train cancellations (Network Rail appealed against the determination. The appeal went to arbitration - see A34 - where a Consent Award was agreed upon.) | ||
ADA32 | (June 17) | Abellio Scotrail | RoU Liability compensation payable in respect of staff time incurred in relation to a Type 3 RoU (Case transferred to Arbitration - A36) | ||
ADA33 | 18.01.18 | Govia Thameslink Railway | Appeal against Delay Attribution Board guidance: Train failure on day following object strike | ||
ADA34 | 22.03.18 | First Transpennine Express | Network Change – proposal to convert Scarborough Oil Sidings to a Light Maintenance Depot | ||
ADA35 | 17.07.18 | Chiltern Railways | Appeal against Delay Attribution Board guidance: Delays caused by overcrowding through displaced passengers | ||
ADA36 | (Jan 18) | First/Keolis Transpennine | Compensation for damage and losses associated with dewirement in Ashburys/Gorton area on 17 January 2012 (settled out of court) | ||
ADA37 | (May 18) | GB Railfreight | Appeal against Delay Attribution Board guidance: Delays resulting from GSMR-R REC activation (settled out of court) | ||
ADA38 | (July 18) | Freightliner | Claim arising out of amended “T-12” process (settled out of court) | ||
ADA39 | (Aug 18) | Freightliner Heavy Haul | Claim arising out of amended “T-12” process (settled out of court) | ||
ADA40 | (Nov 18) | DB Cargo (UK) | Claim arising out of amended “T-12” process (settled out of court) | ||
ADA41 | (Nov 18) | GB Railfreight | Claim arising out of amended “T-12” process (settled out of court) | ||
ADA42 | (Nov 18) | Freightliner | Claim arising out of amended “T-12” process (settled out of court) | ||
ADA43 | (Nov 18) | Freightliner Heavy Haul | Claim arising out of amended “T-12” process (settled out of court) | ||
ADA44 | (Nov 18) | DB Cargo (UK) | Claim arising out of amended “T-12” process (settled out of court) | ||
ADA45 | (Nov 18) | GB Railfreight | Claim arising out of amended “T-12” process (settled out of court) | ||
ADA46 | (Dec 18) | Arriva Rail London | Network Code Part H – Proposal to change Train Regulation Policy on West Anglia route (settled out of court) | ||
ADA47 | (Mar 19) | Network Rail | Fixed charges for CP6 at certain Independent Stations (case transferred to Arbitration - A41) | ||
ADA48 | (July 19) | GB Railfreight | Network Code Part J: application of failure to use process (settled out of court) | ||
ADA49 | 26.02.20 | First MTR South Western Trains | Appeal against Delay Attribution Board guidance: TOC delays exacerbated by unavailable infrastructure | ||
ADA50 | 02.03.21 | GB Railfreight | Part J: Network Rail’s decision in connection with the Freight transfer mechanism - Rights held by DB Cargo | ||
ADA51 | (April 21) | Grand Central Railway | Recalculation of QX charges at stations where Northern Trains is the SFO (settled out of court) | ||
ADA52 | (May 21) | Hull Trains | Type 3 RoU compensation arrangements in Track Access Agreement, Schedule 4 (settled out of court) | ||
ADA53 | (Nov 21) | Freightliner | Network Code Part J: application of failure to use process (settled out of court) | ||
ADA54 | (May 22) | Arriva Rail London | Network Change – Victoria Phase 3 Resignalling Project (settled out of court) | ||
ADA55 | (July 22) | Freightliner | Network Code Part J: application of failure to use process (settled out of court) | ||
ADA56 | (Oct 22) | Network Rail | Network Change – Beaulieu New Station (settled out of court) | ||
ADA57 | 23.11.23 | Grand Central Railway | Network Change: operation of Part G and associated compensation | ||
ADA58 | 10.01.24 | DB Cargo (UK) | Network Code Part J: application of failure to use process | ||
ADA59 | (July 24) | Freightliner & Freightliner Heavy Haul | Network Change: operation of Part G |