PLEASE NOTE

Following changes to the ADR Rules, relevant disputes notified between 15 April 2005 and 31 July 2010 were registered for determination by an Access Disputes Panel - see separate section of this site.

Following further changes to the ADR Rules effective from 1 August 2010, relevant disputes may now be registered for determination by Access Disputes Adjudication, Arbitration, Expert Determination or the Court - see separate sections of this site.

Note:

Disputes reference NV75 – NV77 inc and NV79 – NV84 inc were advised to the Access Dispute Resolution Committee Secretary to be addressed by the Network and Vehicle Change Committee in accordance with the procedures applicable prior to 14 April 2005. Following implementation of the revised Access Dispute Resolution Rules, these references were considered by a Timetabling Panel of the Access Disputes Committee, with hearings held on 19 & 25 April and 9 May 2005. The Timetabling Panel recorded its determinations in a single document titled “Panel Decision no. 1” and each of these references has a link provided to that document.

Reference Number PDF Version Date Reference From Subject Submissions From The Parties
NV1 NV1 24.05.96 Mainline Freight Network Change: Application of clause (i) or (iii) of the definition in assessing compensation for restriction of facilities following a landslip (on the Greenford loop). Whilst the Committee’s determination of this dispute NV1 was not appealed, the Regulator subsequently declared that it was wrongly decided - see appeal of dispute NV33.
NV2 NV2 12.11.96 South Wales & West Railway Network Change: Provision of the Weather Forecast
NV3 (July 97) Connex South Central Change in Performance arising from alleged, [unpublicised] Network Change (withdrawn by the referrer)
NV4 NV4 02.10.97 Regional Railways North East and Railtrack Network Change: Special Working arrangements on the York - Scarborough line
NV5 NV5 12.07.01 Connex South Eastern Vehicle Change: Infrastructure costs incurred in providing route clearance for new Class 375 trains
NV6 (Sept.99) Cardiff Railway Co. Network Change: Withdrawal of permissive working at Cardiff Queen Street
NV7 NV7 25.07.00 North Western Trains Network Change: Claim for compensation in respect of Manchester South Resignalling. The Committee formally commenced a hearing of this reference NV7, but Members were unhappy with the disparate views represented by the parties as to the issues of difference between them. It was noted that attempts to produce a joint submission had proved unsuccessful. Nevertheless the Committee was satisfied that, in relation to the issues at stake, and the provisions of Track Access Conditions G2.4 and G6, there was a need to bring the dispute formally to the Committee, but it declined, on the basis of the arguments presented, to formulate a determination until the parties had undertaken further discussions. In the meantime the Committee issued a Note of Guidance to the Parties. The Committee exhorted the parties to resume discussions with a view to reaching either a full understanding and agreement of all the matters of the current dispute, or to produce and submit a joint statement defining in detail the areas of difference upon which the determination of the Committee is sought. The parties were unable to produce such a submission by the due date and the ADRC commissioned a Sub-Committee with a remit to prepare a set of papers that would enable the Committee to proceed to determine this case. However the parties concluded successful discussions without the need for the Sub-Committee to meet.
NV8 NV8 6/12.09.00 North Western Trains Major Project Notice: West Coast Mainline Route Modernisation
NV9 NV9 6/12/26.09 & 06.10.00 Freightliner Major Project Notice: West Coast Mainline Route Modernisation
NV10 06.09.00 ScotRail Railways Major Project Notice: West Coast Mainline Route Modernisation. During the period of the hearing, ScotRail concluded successful negotiations with Railtrack and withdrew its reference.
NV11 (July 00) Central Trains Major Project Notice: West Coast Mainline Route Modernisation (settled out of court)
NV12 06.09.00 West Coast Trains Major Project Notice: West Coast Mainline Route Modernisation. During the period of the hearing, West Coast Trains concluded successful negotiations with Railtrack and withdrew its reference.
NV13 NV13 6/12/26.09 & 06.10.00 English Welsh & Scottish Railway Major Project Notice: West Coast Mainline Route Modernisation
NV14 (Aug. 00) English Welsh & Scottish Railway Major Project Notice: Tyne & Wear Metro Extension to Sunderland (settled out of court)
NV15 NV15 23.10.00 North Western Trains Network Change - Issue: whether the imposition of a 20mph speed restriction in the Manchester Piccadilly station throat was made under Track Access Condition G1 or G5.
NV16 NV16 23.10.00 Northern Spirit Network Change: (same subject as NV15 above)
NV17 NV17 24.01.01 English Welsh & Scottish Railway Major Project Notice: West Coast Mainline Route Modernisation PUG2 Phase 1
NV18 NV18 24.01.01 Freightliner Major Project Notice: West Coast Mainline Route Modernisation PUG2 Phase 1
NV19 (Feb. 01) Railtrack (in response to Freightliner) Network Change: West Coast Route Modernisation line speed improvements (settled out of court)
NV20 Feb. 01 Railtrack (in response to English Welsh & Scottish Railway) Network Change: West Coast Route Modernisation line speed improvements (withdrawn by referrer)
NV21 NV21 09.04.01 Freightliner Network Change: Installation and operation of Wheelchex equipment
NV22 NV22 17.01.02 Freightliner Major Project Notice: Cross Country Upgrade Programme
NV23 (June 01) English Welsh & Scottish Railway Major Project Notice: Cross Country Upgrade Programme (withdrawn by referrer)
NV24 (June 01) Central Trains Major Project Notice: Cross Country Upgrade Programme (settled out of court)
NV25 (June 01) Central Trains Major Project Notice: West Coast Route Modernisation - Phase 2 (settled out of court)
NV26 NV26 19/20.09.01 Freightliner Major Project Notice: West Coast Route Modernisation - Phase 2
NV27 (June 01) Arriva Trains Northern Major Project Notice: West Coast Route Modernisation - Phase 2 (settled out of court)
NV28 19/20.09.01 ScotRail Railways Major Project Notice: West Coast Route Modernisation - Phase 2
NV29 NV29 19/20.09.01 Silverlink Train Services Major Project Notice: West Coast Route Modernisation - Phase 2
NV30 NV30 19/20.09.01 West Coast Trains Major Project Notice: West Coast Route Modernisation - Phase 2
NV31 NV31 19/20.09.01 English Welsh & Scottish Railway Major Project Notice: West Coast Route Modernisation - Phase 2
NV32 (June 01) North Western Trains Major Project Notice: West Coast Route Modernisation - Phase 2 (settled out of court)
NV33 NV33NV33 14/15/23/28.11.01 Great North Eastern Railway Network Change: Four Network Change Notices served by Great North Eastern Railway on Railtrack in respect of Hatfield (determination issued; referred on appeal to the Rail Regulator)
NV34 (July 01) Great Western Trains Network Change: Alleged that Railtrack made changes to the Network without following the provisions of Part G of the Access Conditions (settled out of court)
NV35 NV35 13.12.01 ScotRail Railways Vehicle Change: Infrastructure costs incurred in providing route clearance for new Class 170 and 334 rolling stock in Scotland
NV36 (Mar. 02) Railtrack Network Change: Cross Country Route Modernisation (settled out of court)
NV37 NV37 7 & 8.11.02 North Western Trains Major Project Notice: West Coast Route Modernisation - Phase 3
NV38 NV38 7 & 8.11.02 ScotRail Railways Major Project Notice: West Coast Route Modernisation - Phase 3
NV39 (June 02) Central Trains Major Project Notice: West Coast Route Modernisation - Phase 3 (withdrawn by referrer)
NV40 NV40 7 & 8.11.02 Silverlink Train Services Major Project Notice: West Coast Route Modernisation - Phase 3
NV41 NV41 7 & 8.11.02 English Welsh & Scottish Railway Major Project Notice: West Coast Route Modernisation - Phase 3
NV42 (June 02) West Coast Trains Major Project Notice: West Coast Route Modernisation - Phase 3 (withdrawn by referrer)
NV43 NV43 7 & 8.11.02 Freightliner Major Project Notice: West Coast Route Modernisation - Phase 3
NV44 NV44NV44 27.09.02 Great North Eastern Railway Compensation relating to the “Leeds 1st ” project
NV45 (June 02) Great North Eastern Railway Quantification of sums due to GNER pursuant to Determination NV33 (settled out of court)
NV46 NV46 7 & 8.11.02 Arriva Trains Northern Major Project Notice (Amendment no.1): West Coast Route Modernisation - Phase 3
NV47 19.11.03 North Western Trains Major Project Notice: West Coast Route Modernisation - Phase 4 (Following adjournment of the hearing, the referrer withdrew the reference)
NV48 (July 03) Freightliner Major Project Notice: West Coast Route Modernisation - Phase 4 (settled out of court)
NV49 (July 03) Central Trains Major Project Notice: West Coast Route Modernisation - Phase 4 (settled out of court)
NV50 NV50 19.11.03 Silverlink Train Services Major Project Notice: West Coast Route Modernisation - Phase 4
NV51 19.11.03 English Welsh & Scottish Railway Major Project Notice: West Coast Route Modernisation - Phase 4 (Following adjournment of the hearing, the referrer withdrew the reference)
NV52 19.11.03 ScotRail Railways Major Project Notice: West Coast Route Modernisation - Phase 4 (Dismissed – no locus)
NV53 NV53 8/23.12.03 ScotRail Railways Network Rail’s decision that an extensive programme of works on the Forth Bridge does not constitute Network Change
NV54 (Nov.03) ScotRail Railways Revenue losses resulting from a Network change (settled out of court)
NV55 NV55 17.02.04 English Welsh & Scottish Railway Network Rail’s proposal to institute a “2-track” railway: Paddington – Didcot
NV56 (Nov.03) Silverlink Train Services Network Rail’s proposal for a 9-day all lines block in May 2004 (settled out of court)
NV57 NV57 16.03.04 Network Rail Network Change notice: Stowmarket Up & Down Goods Loop
NV58 NV58NV58 20.04.04 Network Rail Network Change notice: Ruscombe Up Goods Loop
NV59 NV59 05.05.04 Network Rail Network Change: Reimbursement of costs for Gauge clearance works for Class 170/334 Units (see NV35)
NV60 NV60 (Feb.04) Freightliner Major Project Notice: West Coast Route Modernisation – Dec.04-Dec.05 works
NV61 (Feb.04) CrossCountry Trains Major Project Notice: West Coast Route Modernisation – Dec.04-Dec.05 works (withdrawn by the referrer)
NV62 (Mar.04) ScotRail Railways Major Project Notice: West Coast Route Modernisation – Dec.04-Dec.05 works (settled out of court)
NV63 (Mar.04) English Welsh & Scottish Railway Major Project Notice: West Coast Route Modernisation – Dec.04-Dec.05 works (settled out of court)
NV64 (Mar.04) North Western Trains Major Project Notice: West Coast Route Modernisation – Dec.04-Dec.05 works (settled out of court)
NV65 (Mar.04) Silverlink Train Services Major Project Notice: West Coast Route Modernisation – Dec.04-Dec.05 works (settled out of court)
NV66 (Mar.04) Freightliner Heavy Haul Major Project Notice: West Coast Route Modernisation – Dec.04-Dec.05 works (settled out of court)
NV67 (Mar.04) Arriva Trains Northern Major Project Notice: West Coast Route Modernisation – Dec.04-Dec.05 works (settled out of court)
NV68 (Mar.04) Arriva Trains Wales Major Project Notice:
NV69 (Apr.04) West Coast Trains The method of implementation set out in a document entitled “NAM 71 Stockport Confirm Changes” (settled out of court)
NV70 (Apr.04) Central Trains The method of implementation set out in a document entitled “NAM 71 Stockport Confirm Changes” (settled out of court)
NV71 NV71 18.05.04 West Coast Trains Withdrawal of a previously agreed Network Change
NV72 (May 04) CrossCountry Trains Major Project Notice: Liverpool South (October 2004 - October 2005) (Settled out of court)
NV73 (May 04) Network Rail PENDING Network Change: speed restrictions on the Saltburn branch
NV74 NV74 02.09.04 CrossCountry Trains Whether the format of the documentation supplied in respect of Section 7 of Rules of the Route for 2005 had changed in ways, and to an extent, that it should be construed as a Network Change
NV75 NV75 19/25.4.05 & 9.05.05 by a Timetabling Panel See note at the end of this document English Welsh & Scottish Railway Major Project Notice: West Coast Route Modernisation – Dec.05-Dec.06 works
NV76 NV76 19/25.4.05 & 9.05.05 by a Timetabling Panel See note at the end of this document First ScotRail Major Project Notice: West Coast Route Modernisation – Dec.05-Dec.06 works
NV77 NV77 19/25.4.05 & 9.05.05 by a Timetabling Panel See note at the end of this document GB Railfreight Major Project Notice: West Coast Route Modernisation – Dec.05-Dec.06 works
NV78 (Mar.05) Silverlink Train Services Major Project Notice: West Coast Route Modernisation – Dec.05-Dec.06 works. This reference is concerned solely with matters of compensation; it is a matter, if unresolved, for Silverlink to refer to be heard by an Access Disputes Panel;
NV79 NV79 19/25.4.05 & 9.05.05 by a Timetabling Panel See note at the end of this document Freightliner Major Project Notice: West Coast Route Modernisation – Dec.05-Dec.06 works. Although the Timetabling Panel heard those aspects of the dispute that were within its locus, the remaining issues, being matters of compensation, were referred to be heard by an Access Disputes Panel – see reference ADP10 [on the Access Disputes Committee page]
NV80 NV80 19/25.4.05 & 9.05.05 by a Timetabling Panel See note at the end of this document Freightliner Heavy Haul Major Project Notice: West Coast Route Modernisation – Dec.05-Dec.06 works. Although the Timetabling Panel heard those aspects of the dispute that were within its locus, the remaining issues, being matters of compensation, were referred to be heard by an Access Disputes Panel – see reference ADP10 [on the Access Disputes Committee page]
NV81 NV81 19/25.4.05 & 9.05.05 by a Timetabling Panel See note at the end of this document First/Keolis Transpennine Express Major Project Notice: West Coast Route Modernisation – Dec.05-Dec.06 works
NV82 NV82 19/25.4.05 & 9.05.05 by a Timetabling Panel See note at the end of this document Direct Rail Services Major Project Notice: West Coast Route Modernisation – Dec.05-Dec.06 works
NV83 NV83 19/25.4.05 & 9.05.05 by a Timetabling Panel See note at the end of this document West Coast Trains Major Project Notice: West Coast Route Modernisation – Dec.05-Dec.06 works
NV84 NV84 19/25.4.05 & 9.05.05 by a Timetabling Panel See note at the end of this document Central Trains Major Project Notice: West Coast Route Modernisation – Dec.05-Dec.06 works